Bridge List
S.N. | Bridge ID | River / Bridge Name | District | Category | Status |
201. | 13DR008BR013 | Sapsu Khola Bridge -II | Khotang | Bridge-BR | Construction Completed Bridge |
202. | 13-H10-1806-8 | Tuwa Khola Bridge (Batase) | Khotang | Bridge-BR | Construction Completed Bridge |
203. | 14--1806-5 | Andhari Khola Bridge (DoR Bridge) | Udayapur | Bridge-BR | Construction Completed by Other |
204. | 11DR001BR017 | Solu Khola/Solu Khola Bridge | Solukhumbu | Bridge-BR | Construction Completed Bridge |
205. | 11--1806-2 | Khahare Khola Bridge (Necha Salyan) | Solukhumbu | Bridge-BR | Construction Completed Bridge |
206. | 11--1806-3 | Thado Khola/Baradi Khola Bridge (Undertaken By DOR) | Solukhumbu | Bridge-BR | Under Construction by Other |
207. | 11--1806-4 | Ghatte Chewang Khola/ Ghatte Chewang Bridge | Solukhumbu | Bridge-BR | Under Design Bridge |
208. | 42-42B001R-1806 | Kaligandaki River Bridge (Eklebhatti) | Mustang | Bridge-BR | Under Construction Bridge |
209. | 42-42C005R-1806 | Kaligandaki River Bridge (Lete) | Mustang | Bridge-BR | Under Construction Bridge |
210. | 21DR002BR039 | Bhatauli khola bridge (Bhatauli) | Ramechap | Bridge-BR | Construction Completed Bridge |
211. | 21-21B013R-1806 | Bhatauli khola bridge-II(Thulo Khet) | Ramechap | Bridge-BR | Under Construction Bridge |
212. | 21DR002 BR032 | Khani khola bridge (Rajmanntar) | Ramechap | Bridge-BR | Construction Completed Bridge |
213. | 21--1806-4 | Khani khola bridge (Odare) | Ramechap | Bridge-BR | Walkover Surveyed |
214. | 21--1806-5 | Chauri khola bridge (Domtar) | Ramechap | Bridge-BR | Walkover Surveyed |
215. | 21--1806-6 | Chauri khola bridge (Dobhantar) | Ramechap | Bridge-BR | Walkover Surveyed |
216. | 21-21B034R-1806 | Bafar khola bridge | Ramechap | Bridge-BR | Walkover Surveyed |
217. | 21--1806-8 | Likhu khola bridge | Ramechap | Bridge-BR | Design Verified |
218. | 21-21A029R-1806 | Poku khola bridge | Ramechap | Bridge-BR | Walkover Surveyed |
219. | 21DR016BR039 | Sindurpa khola bridge | Ramechap | Causeway-CA | Construction Completed Bridge |
220. | 21DR016BR039 | Burke khola bridge | Ramechap | Causeway-CA | Construction Completed Bridge |